DOE formally accepted the Design Baseline under ICRC Release ECP 4-1001, at the Project Configuration Control Board meeting in Oak Ridge, Tennessee on 5 November 1981. for custody, according to past instructions from DOE, and is available for perusal by authorized DOE representatives. The sixth volume, containing proprietary information on Kerr-McGee's Critical Solvent Deashing System, was forwarded to BRHG Synthetic Fuels, Inc. The fifth volume, summarizing the Category A Engineering Change Proposals (ECPs), was not submitted. The first four were submitted to DOE on 9 September 1981. The SRC Process Area Design Baseline consists more ยป of six volumes. Revision 6, dated 19 March 1982, 51 pages, was forwarded to DOE on 19 March 1982. 2 has been submitted to DOE and revised, as necessary, to be consistent with the SRC-I Project Baseline. It sets forth: basic engineering data, e.g., type and size of plant, feedstocks, product specifications, and atmospheric emission and waste disposal limits utility conditions equipment design criteria and sparing philosophy and estimating criteria for economic considerations. The Process Design Criteria Specification forms the basis for process design for the 6000-TPSD SRC-I Demonstration Plant.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |